HC Solicitors

Mar 28, 2019

Working closely with the team at HC Solicitors, we worked through several design layouts of the reception area, meeting rooms, training room and hallway before the concept was signed off.

Now the design was approved we started bringing the concept to life.

  • Removing all the old items no longer required, and set to work installing new partitioning, chasing walls out for new cabling and getting the walls plastered.
  • Painting and decorating the newly plastered walls to clients specified colourways and refurbished the existing hard wood staircase.
  • Laying the new carpet tiles and lvt flooring with safety joining strips.
  • Installing new reception counter, storage, break out and meeting room seating and bespoke glass coffee table.

Once the project was complete, we handed over to the client for them to enjoy their newly refurbished workplace.